Customization: | Available |
---|---|
Certification: | ISO9001, CE |
Application: | Transformer Oil, Insulation Oil |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameters | Model Unit |
ZYD-I-W-30 | ZYD-I-W-50 | ZYD-I-W-100 | ZYD-I-W-150 | ZYD-I-W-200 | ZYD-I-W-250 | ZYD-I-W-300 |
Flow Rate | L/H | 1800 | 3000 | 6000 | 9000 | 12000 | 15000 | 18000 |
Working Vacuum Degree | MPa | -0.08 ~ -0.099 | ||||||
Working Discharge Pressure |
MPa | ≤ 0.5 | ||||||
Temperature Control Range |
ºC | 0 ~ 100 | ||||||
Operation Temperature | ºC | 30 ~ 80 (65ºC is best) | ||||||
Power Supply | 380V, 50Hz, 3 phases (or as per your requirements) | |||||||
Working hours without Trouble |
Hour | 4000 | ||||||
Continuous Working Hours | Hour | 150 | ||||||
Ambient Temperature | -25 ~ 55ºC | |||||||
Working Noise | dB(A) | 65 ~ 85 | ||||||
Heating Power (adjusted available) |
KW | 30 | 72 | 90 | 120 | 135 | 150 | 180 |
Total Power | KW | 36 | 78 | 105 | 136 | 150 | 170 | 206 |
Inlet/Outlet | mm | φ25 | φ32 | φ50 | φ50 | φ50 | φ60 | φ60 |
Weight | Kg | 500 | 900 | 1200 | 1400 | 1650 | 1800 | 1950 |
Dimension | mm | 1380×1020×1760 | 1610×1250×1950 | 1750×1350×2150 | 1850×1400×2200 | 1950×1500×2300 | 2050×1600×2400 | 2200×1750×2550 |
After Filtration | Moisture (Water Content) ≤ 5 PPM | |||||||
Gas Content ≤0.1% | ||||||||
Impurities Degree (Filtration precision) ≤ 1 micron (no free carbon) | ||||||||
Breakdown Voltage (Dielectric Strength) ≥70~80 KV | ||||||||
Flash Point ≥145ºC | ||||||||
Cleanliness ≤NAS 1638 Grade 6 |
Note: 1. The dimension and weight will be changed with changing of technical specs.
2. All the specs can be customized according to client's requirements.
1.Elimination of residual gas from the insulation.
2. Drying of transformer insulation.
3.Easy and failsafe operation.
4.On-line measuring and recording of process parameters.
5.Flexibility in application (various oil types and oil volumes).
6.Purify your transformer oil high efficiently.
7.Maintain your transformer oil always in good status, extend the oil's lifespan.
8. Reduce and save oil costs in terms of consumption, replacement and inventory.
9.Solve your waste transformer oil disposal problem.
10.Ensure your transformers working normally with qualified oil properly.
11.Protect your transformers and power equipment from oil pollution problems.
12.Reduce your maintenance time, energy and cost on transformers and power plant.
13.Create safety and cleaning oil-using environment for your transformers of power station.